How It Works

Here’s how the journey unfolds from our first hello to the final reveal of your beautifully remodeled bathroom

Initial Contact

  • Consultation Request: The process begins when you reach out to us via phone, email, or our website to request a consultation.
  • Initial Discussion: We discuss your vision, needs, and budget during this initial contact. We’ll also schedule an in-home consultation at your convenience.

In-Home Consultation

  • Site Visit: One of our experienced designers will visit your home to evaluate the existing bathroom and discuss your ideas in more detail.
  • Needs Assessment: We’ll assess your specific requirements, such as accessibility features, style preferences, and any structural changes you desire.
  • Preliminary Measurements: Initial measurements are taken to understand the space and envision the possibilities.

Design and Planning

  • Design Proposal: Based on our discussions, we create a detailed design proposal that includes layout plans, material selections, and estimated costs.
  • Review and Adjust: We’ll review the proposal with you, making any necessary adjustments to ensure it perfectly matches your vision.
  • Final Approval: Once you’re satisfied with the design, you approve the final plans and provide a deposit to secure your project on our schedule.

Pre-Construction

  • Permitting: If required, we obtain the necessary permits from local authorities to ensure everything is up to code.
  • Ordering Materials: We order all the materials and fixtures needed for your remodel, coordinating with suppliers to ensure timely delivery.
  • Scheduling: We develop a detailed timeline for the project, keeping you informed of the start date and expected completion.

Construction

  • Demolition: The transformation begins with removing old fixtures, flooring, and any other elements no longer needed.
  • Structural Work: If your remodel includes structural changes, we take care of framing, plumbing, and electrical work to prepare the space for new installations.
  • Rough-In: Plumbing, electrical, and any necessary HVAC work are roughed-in according to the new design.
  • Drywall and Insulation: New drywall is installed, and insulation is added where necessary to ensure comfort and efficiency.
  • Tiling and Flooring: Walls and floors are tiled, giving your bathroom a fresh, new look.
  • Fixture Installation: New bathtubs, showers, toilets, sinks, and other fixtures are installed, bringing the design to life.
  • Cabinetry and Storage: New cabinets, vanities, and storage solutions are put in place.
  • Painting and Finishing Touches: The final coat of paint is applied, and we install last-minute details like mirrors, light fixtures, and hardware.

Final Stages

  • Inspection: We conduct a thorough inspection to ensure everything is installed correctly and functions perfectly.
  • Clean-Up: Our team cleans the site, leaving your new bathroom spotless.
  • Final Walkthrough: We walk you through the finished bathroom, ensuring everything meets your expectations and answering any questions you may have.

Project Completion

  • Enjoy Your New Bathroom: With everything completed to your satisfaction, it’s time to enjoy your beautiful, remodeled bathroom!
  • Follow-Up: We’ll follow up after a few weeks to ensure you’re completely happy with your new space and to address any concerns or additional adjustments needed.

This process ensures a smooth, enjoyable experience from start to finish, resulting in a bathroom that is both beautiful and functional. Feel free to ask any questions or let me know if you need more details on any part of the process!