How It Works
Here’s how the journey unfolds from our first hello to the final reveal of your beautifully remodeled bathroom
Initial Contact
- Consultation Request: The process begins when you reach out to us via phone, email, or our website to request a consultation.
- Initial Discussion: We discuss your vision, needs, and budget during this initial contact. We’ll also schedule an in-home consultation at your convenience.
In-Home Consultation
- Site Visit: One of our experienced designers will visit your home to evaluate the existing bathroom and discuss your ideas in more detail.
- Needs Assessment: We’ll assess your specific requirements, such as accessibility features, style preferences, and any structural changes you desire.
- Preliminary Measurements: Initial measurements are taken to understand the space and envision the possibilities.
Design and Planning
- Design Proposal: Based on our discussions, we create a detailed design proposal that includes layout plans, material selections, and estimated costs.
- Review and Adjust: We’ll review the proposal with you, making any necessary adjustments to ensure it perfectly matches your vision.
- Final Approval: Once you’re satisfied with the design, you approve the final plans and provide a deposit to secure your project on our schedule.
Pre-Construction
- Permitting: If required, we obtain the necessary permits from local authorities to ensure everything is up to code.
- Ordering Materials: We order all the materials and fixtures needed for your remodel, coordinating with suppliers to ensure timely delivery.
- Scheduling: We develop a detailed timeline for the project, keeping you informed of the start date and expected completion.
Construction
- Demolition: The transformation begins with removing old fixtures, flooring, and any other elements no longer needed.
- Structural Work: If your remodel includes structural changes, we take care of framing, plumbing, and electrical work to prepare the space for new installations.
- Rough-In: Plumbing, electrical, and any necessary HVAC work are roughed-in according to the new design.
- Drywall and Insulation: New drywall is installed, and insulation is added where necessary to ensure comfort and efficiency.
- Tiling and Flooring: Walls and floors are tiled, giving your bathroom a fresh, new look.
- Fixture Installation: New bathtubs, showers, toilets, sinks, and other fixtures are installed, bringing the design to life.
- Cabinetry and Storage: New cabinets, vanities, and storage solutions are put in place.
- Painting and Finishing Touches: The final coat of paint is applied, and we install last-minute details like mirrors, light fixtures, and hardware.
Final Stages
- Inspection: We conduct a thorough inspection to ensure everything is installed correctly and functions perfectly.
- Clean-Up: Our team cleans the site, leaving your new bathroom spotless.
- Final Walkthrough: We walk you through the finished bathroom, ensuring everything meets your expectations and answering any questions you may have.
Project Completion
- Enjoy Your New Bathroom: With everything completed to your satisfaction, it’s time to enjoy your beautiful, remodeled bathroom!
- Follow-Up: We’ll follow up after a few weeks to ensure you’re completely happy with your new space and to address any concerns or additional adjustments needed.